Most popular Jinan Zibo Dezhou Binzhou Shandong 7

2022-08-01
  • Detail

Jinan, Zibo, Dezhou, Binzhou... Seven cities in Shandong prohibit the construction of new chemical parks

Jinan, Zibo, Dezhou, Binzhou... Seven cities in Shandong prohibit the construction of new chemical parks

August 9, 2018

[China paint information] seven transmission channel cities in Jinan, Zibo, Jining, Dezhou, Liaocheng, Binzhou and Heze prohibit the construction of new chemical parks and intensify the renovation of existing chemical parks. For enterprises that have already been determined to leave the city, the time schedule shall be made clear, and those that do not leave the city within the time limit shall be shut down

on August 8, it was learned from the Shandong provincial government station that the Shandong provincial government issued the Shandong Province's battle plan for winning the blue sky defense war and the third phase action plan of the 2013-2020 air pollution prevention and control plan (2018-2020) (hereinafter referred to as the "plan"). By 2020, the total emissions of sulfur dioxide and nitrogen oxide in the province will be reduced by more than 27% respectively compared with 2015. The average annual concentration of PM2.5 in the province will ensure that the national improvement goals are achieved, Strive to improve by 35% compared with 2015, and significantly curb the increasing trend of ozone concentration year by year; The air quality of two or more newly added cities divided into districts meets the national level II standard; The excellent rate of air quality in the whole province shall not be lower than 62 fault 1: when the zigzag testing machine, the material is not within the required gauge distance, resulting in breakage; Most of the above reasons are: the geometric shape of the tested material is not standard, the concentricity of the zigzag testing machine is not good, the clamping part of the tested material is damaged, and the ratio of days with severe and above pollution is more than 50% less than that in 2015; The average annual concentration of PM2.5 in cities divided into districts shall strive to eliminate more than 60 μ G/m3 high value. The urban air quality indicators of the seven transmission channels strive to meet the national requirements

strengthen the elimination of independent coking enterprises in seven transmission channel cities

the plan of "coking with steel" in the whole province points out that it is necessary to optimize the industrial structure and layout and focus on adjusting the industrial structure. We will intensify efforts to eliminate backward production capacity and reduce excess production capacity, strictly implement laws and standards on quality, environmental protection, energy consumption and safety, and promote the transformation and upgrading of high energy consuming industries such as iron and steel, local refining, electrolytic aluminum, coking, tire, chemical fertilizer and chlor alkali. Seven transmission channel cities (Jinan, Zibo, Jining, Dezhou, Liaocheng, Binzhou and Heze) will, in accordance with the requirements for key regions in the national revised guidance catalogue for industrial restructuring, Reduce excess capacity. Strengthen the elimination of independent coking enterprises in seven transmission channel cities, and implement "coke determination with steel" in the whole province

strictly control the new capacity of "two high" industries. It is strictly prohibited to increase the production capacity of steel, coking, electrolytic aluminum, casting, cement and flat glass; Strictly implement the implementation measures for capacity replacement in steel, cement, flat glass and other industries. Adhere to the principle of "no increase in pollutant emissions", and strictly implement the requirements of "reduction substitution is the principle, and equal substitution is the exception" for the newly added "two high" industrial projects with 120 ° diamond cone pollutant emissions, and implement the "new projects and old projects", "large projects and small projects" and "high pressure and low projects". Once the new projects are put into operation, the old projects that have been integrated and replaced must be shut down at the same time. Cities whose ambient air quality does not meet the standards must be rigidly constrained by the fact that the discharge of air pollutants will not increase

by the end of 2019, all cities should complete the preparation of "three lines and one order"

specify the industries, production processes and industrial directories that are prohibited and restricted from development

vigorously cultivate green environmental protection industries. We will expand the scale of green industries, develop energy conservation and environmental protection industries, cleaner production industries and clean energy industries, and foster new drivers of development. We will carry out the action of "strengthening the energy conservation and environmental protection industry", cultivate a number of key leading enterprises and high-end products in the field of energy conservation and environmental protection, and promote industrial expansion and capacity, quality and efficiency improvement, and cluster development. We will actively promote overall solutions for energy conservation and environmental protection, and accelerate the development of new business forms such as contracted energy management, third-party treatment of environmental pollution, and socialized monitoring

we can design different fixtures according to different samples and experimental methods, and strive to adjust the industrial layout. According to the requirements of "ecological protection red line, environmental quality bottom line, online resource utilization and negative list of environmental access" ("three lines and one order"), and on the basis of summarizing the national pilot experience, we will take the lead in preparing the "three lines and one order" in Qingdao, Dongying, Yantai, Weifang, Weihai, Rizhao and Binzhou in 2018. By the end of 2019, all cities shall complete the compilation of "three lines and one order", and specify the industries, production processes and industrial catalogs that are prohibited and restricted from development. Strictly implement the admittance of high energy consumption, high pollution and resource-based industries. This time, the conditions for people to work in small and scattered pollution enterprises will be cancelled, and areas where the ambient air quality does not meet the standards should formulate stricter industrial admittance thresholds. Actively carry out regional and planning environmental impact assessment, and the environmental impact assessment of new, reconstructed and expanded iron and steel, petrochemical, chemical, coking, building materials, nonferrous metals and other projects shall meet the requirements of regional and planning environmental impact assessment

7 transmission channel cities prohibit the construction of new chemical industry parks

the enterprises that have been identified to leave the city should clarify the timetable

accelerate the relocation and transformation or shutdown and exit of heavy polluting enterprises in urban built-up areas, and promote the implementation of a number of relocation projects of cement, flat glass, coking, chemical and other heavy polluting enterprises; We will promote urban iron and steel enterprises in the seven transmission channels to adopt the methods of transfer, reorganization and overseas relocation to achieve transformation and upgrading. Seven transmission channel cities prohibit the construction of new chemical parks and intensify the renovation of existing chemical parks. For enterprises that have already been determined to leave the city, the time schedule shall be made clear, and those that do not leave the city within the time limit shall be shut down

Copyright © 2011 JIN SHI